1 |
Structure & Construction: |
The structural frame work shall be all welded type to comprise of the bottom frame, overall framework, internal external cladding with insulation & other peripherals, sloping self-draining roof. It would be an all welded construction, in which the main corner vertical support posts shall be made from M.S. square pipe structural with lifting arrangement. |
2 |
Base Frame |
100mmx50mm-c channel/ I beam |
3 |
Top frame |
50mmX50mm MS Sq. Pipe |
4 |
Stiffener Bottom |
80mmX40mm MS Sq. Pipe |
5 |
Stiffener Top |
40mmX20mm Sq. Pipe |
6 |
Side Post |
50mmX 50mm MS Sq. Pipe |
7 |
Paneling Outside |
GI sheet 1.2mm Thickness (UTTAM, AMANS, JSW) |
8 |
Internal wall paneling |
8mm MDF BOARD PER LAMINATE |
9 |
Roof Outside |
GI sheet 1.2m Thickness properly Sloped and water tight. (UTTAM, AMANS, JSW) |
10 |
False ceiling |
8mm MDF BOARD pre laminated. |
11 |
Insulation
50 mm Glass wool walls which will be rot proof, fire retardant, non-hygroscopic and vermin proof.
(Side Wall – 25mm), (Ceiling – 50mm) |
|
12 |
Bottom Flooring |
18 mm thick cement board with the top inside layer of the board is covered with PVC Vinyl carpet 1 mm thick. |
13 |
Main Doors |
Outside 1.2mm G.I Shit Inside MDF BOARD with locking arrangement, hold draft, handle . |
14 |
Windows |
Sliding Window 3’x3’ Aluminum Powder coated with safety grill 3mm tented glass |
15 |
Electrical Wairing & Fittings |
ISI mark & concealed PVC conduits insulated copper/Polycab wire used for wiring in PVC conduit with small size distribution board with MCB protection and to separate with main supply |
16 |
Earthing |
Earthling Point shall be provided for SAFETY |
17 |
Outside Painting |
1 coat of epoxy primer with 2 Coat of Epoxy Paint. |
18 |
Legs & Hooks |
6-inch height, Four legs at all four corners. Specially formed Hooks for Easy lifting and Shifting |